1 / 17✕
How did fixing the deadline, not the to-do list, triple productivity?
At DuPont in the 1980s, adopting timeboxing, where the deadline is fixed and the to-do list shrinks to fit, more than tripled developer productivity.
Tap to go on, or swipe →